inVISION Studios Inc inVISION Studios Home Gallery
Gallery About Us Contact


Lake Zurich Road Realignment and Intersection Improvements
IL-23-I-90_Rev-291_(Day)_2506_(540).jpg IL-23-I-90_Rev-291_(Day)_4774_(540).jpg
IL-23-I-90_Rev-290_(Evening)_5646_(540).jpg IL-23-I-90_Rev-290_(Evening)_5756_(540).jpg

In 2017, Civiltech contracted inVISION Studios to produce multiple still images representing the proposed intersection improvements and realignment at Lake Zurich Road.  The purpose of the visualization was to present the intersection design and the benefits of a realignment to the adjacent Barrington Area Library and surrounding nieghborhoods.


The production consisted of building an accurate digital model of the proposed roadway from the client's provided plans and details.  The completed model included accurate pavement markings, signage, adjacent architecture, lighting and general landscaping. Several high resolution images were processed for the client's requirements. We then went on to produce a vehicle simulation video for our own marketing purposes.

...
Project Duration:  Approximately 4 weeks of production (plus video processing) Approximate Video Production Cost :  $18,000



inVISIONS Studios Inc.
13705 North Ivy lake Road

Chillicothe, IL  61523
309.579.3500  
twaldsch@invisionstudios.com

my Linked in profile
World Map - inVISION Studios