inVISION Studios Inc inVISION Studios Home Gallery
Gallery About Us Contact


Quentin Road
QR_Rev-465_(Stills)_0012_(540).jpg QR_Rev-465_(Stills)_0013_(540).jpg
QR_Rev-465_(Stills)_0019_(540).jpg QR_Rev-465_(Stills)_0020_(540).jpg

In 2016, Civiltech Engineering contracted inVISION Studios to produce a video simulation representing the proposed Quentin Road improvements north of Chicago, IL.  The purpose of the visualization was to represent the roadway design, retaining walls, noise barriers and the proposed landscaping to be replaced in front of the many residentail properties along the corridor.


The production consisted of building an accurate digital model of the proposed roadway from the client's provided plans, profile, typical sections, & details.  The completed model depicted accurate pavement markings, signage, lighting, precise existing vegitation, adjacent architecture, and very specific proposed landscaping. No VISSIM or similar traffic data was provided so all traffic movement was improvised in conjunction with the client's direction. 

...
Project Duration:  Approximately 6 weeks of production (plus 2000 hrs of video sequence processing) Approximate Video Production Cost:  $28,500



inVISIONS Studios Inc.
13705 North Ivy lake Road

Chillicothe, IL  61523
309.579.3500  
twaldsch@invisionstudios.com

my Linked in profile
World Map - inVISION Studios